top of page

Smothers Park & Street Scape
Phase 2
Project consisted of all decorative concrete flat work, curb banding, curb and gutter, brick paver base and roadway pavements thought Smoothers Parks, River Walkway, surrounding streets and sections around the new Convention Center. One of the concrete wave patterns throughout the park and streetscape was poured with a "cool gray" grout mix with Black Obsidian Stone broadcast on the top surface of the concrete then washed off similar to exposed aggregate. The Black Obsidian Stone had to be freighted from a quarry in Colorado. A unique feature of the project was the decorative Paddle Wheel that was constructed behind the Hampton Inn.
bottom of page