top of page

INDOT I-69 Corridor
Project consisted of Slip Forming 47,000 LF 33”/45” Concrete Bridge Rail on 52 New and Rehab Bridges. One Bridge was over 2000 LF long and 100 LF High over Wetlands. Installed over 2 miles of 45” variable height concrete median rail. The work was performed for Indiana Department of Transportation (INDOT) new Interstate 69 project from Evansville, IN to Bloomington, IN.
bottom of page